Knowledge

Lighting control obligations, explained.

Clear answers on the German GModG and the EU Energy Performance of Buildings Directive. Every page starts with the short answer, cites its source and carries a review date.

Basics

Law & obligations

GModG exemption: when is lighting control unreasonable?

When does the German lighting control duty under Section 56 GModG not apply? Technical impossibility, economic unreasonableness, a worked example and documents.

Read →

The 70 kW threshold in Germany: is your building affected?

When does the 70 kW threshold in Section 56 GModG apply? What counts per system, when outputs are added, who is responsible, plus a quick check with examples.

Read →

EnEfG and EED: energy audits, implementation plans and lighting

German EnEfG and EU EED duties: energy management above 7.5 GWh, implementation plans above 2.5 GWh, status of bill 21/8027 and where lighting control fits.

Read →

Energy certificates for non-residential buildings from 2027

German energy certificates for non-residential buildings from 1 Jan 2027: demand-based certificate for sale and letting, classes A–G and why lighting counts.

Read →

Building automation under GModG Section 56: duty and functions

Building automation under Section 56(1) GModG: German duty above 70 kW by 31.12.2029, the six functions, new builds, transition, fines and inspections.

Read →

GEG Section 71a vs. GModG Section 56: building automation changes

GEG Section 71a vs. GModG Section 56: threshold 290 to 70 kW, deadline 2024 to 2029, new functions, lighting control, fines and existing systems.

Read →

GModG Section 56 full text: German original and translation

GModG Section 56 full text: all six subsections on building automation and lighting control in the German original, with an unofficial English translation.

Read →

Lighting control obligation: Section 56(6) GModG explained

Section 56(6) GModG requires automatic lighting control in German non-residential buildings above 70 kW by 31 Dec 2029. Duties, exemptions and fines.

Read →

Minimum energy performance for non-residential buildings 2030

Minimum energy performance for existing non-residential buildings in Germany (Section 40 GModG): 3.5 × reference from 2030, 2.95 × from 2033, exemptions.

Read →

Technology & planning

DALI, KNX or wireless lighting control: which one fits?

DALI, KNX, wireless or 0-10 V compared: cabling, cost drivers, BACnet integration, vendor lock-in and scalability, with a decision guide for existing buildings.

Read →

Fluorescent tube ban in the EU: what building owners should plan

EU fluorescent tube ban under RoHS: deadlines for T5, T8 and compact lamps, what is still allowed, and why the LED switch is the time to add sensors.

Read →

Retrofitting lighting control to existing LED luminaires

Retrofitting lighting control without new luminaires: driver requirements, reading the type plate, AUX or EFS104, wireless instead of cabling, process.

Read →

High-bay occupancy sensors for warehouses: 6 to 15 m explained

High-bay occupancy sensors for warehouses: sensor and lens by mounting height, racking aisles, forklift lead, hold times, IP66 and common mistakes.

Read →

Presence detector vs motion sensor: differences and use cases

Presence detector or motion sensor? Differences, PIR, ultrasonic, microwave and dual-tech, use in offices, halls, corridors and toilets, and Section 56 GModG.

Read →

Daylight harvesting control: function, zones and real savings

Daylight harvesting explained: light sensor, constant light, daylight zones, calibration, LBNL savings, common mistakes and Germany's 2027 reference building.

Read →

Zoning and occupancy detection under § 56 GModG explained

What appropriate zoning and occupancy detection under Germany's § 56 GModG mean in practice: zones by building type, sensors, mounting heights and mistakes.

Read →

Savings & verification

Funding

Standards & energy balance

Europe

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.