Law & obligations

Building automation under GModG Section 56: duty and functions

Updated 18 November 20266 min readSensMotion editorial team
In shortUnder Section 56(1) of the GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz), non-residential buildings whose heating, air-conditioning or combined system exceeds 70 kW rated output must have building automation with the six functions of subsection 2 by the end of 31.12.2029. New buildings also need automation grade C or B and technical commissioning management. Automatic lighting control under subsection 6 is a separate, additional duty: it supplies data but does not replace building automation.
At a glance
Duty
building automation and control system (Section 56(1) GModG)
Deadline
end of 31.12.2029 (Section 56(1) GModG)
New builds
at least automation grade C above 70 kW, B above 290 kW (Section 56(3) GModG)
Fine
up to €5,000 (Section 108(1) No. 7 and (2) No. 3 GModG; No. 8 from 01.01.2027)
Inspection
not required with building automation under Section 56(2) (Section 74(3) No. 1 GModG, from 01.01.2027)

Who needs building automation, and by when?

This German duty has been law since 29.07.2026 (Art. 1 No. 26, BGBl. 2026 I No. 226). It covers non-residential buildings in which a heating system, a combined space heating and ventilation system, an air-conditioning system or a combined air-conditioning and ventilation system exceeds 70 kW rated output. The threshold applies per system. According to a widely held interpretation, generators of one integrated system are added up, separate systems are not. The owner is responsible (Section 8 GModG), in let buildings usually the landlord. How to check the threshold: Am I affected? The 70 kW threshold.

The duty lapses only if equipping the building is "technisch nicht möglich oder wirtschaftlich unzumutbar" (technically not possible or economically unreasonable). The yardstick is the economic efficiency principle in Section 5; exemptions are governed by Section 102. The costs are offset by concrete benefits: building automation makes efficiency losses visible and, from 2027, can remove the inspection duty. An exemption therefore needs a robust case-by-case calculation; see Exemption: economically unreasonable. Subsection 5 exempts only buildings serving national and alliance defence.

Which six functions does subsection 2 require?

Subsection 2 describes capabilities, not technology. Full text: GModG Section 56 full text. In practice:

  • Monitor, log, analyse and adjust: consumption of all main energy carriers and all technical building systems is recorded and stored continuously. According to the wording, the system must also be able to adjust consumption; read-outs alone are not enough.
  • Open interface: data must be accessible via a "common and freely configurable interface" so that analyses do not depend on one manufacturer. The law prescribes no specific protocol; BACnet/IP is a widely used example.
  • Target values: energy efficiency targets are set for the building, against which operation can be measured.
  • Detect efficiency losses: the system spots deviations, such as plant running outside operating hours.
  • Inform the operator: possible improvements are actively reported, for example through reports or alerts.
  • Monitor indoor environmental quality: this function is new compared with the former Section 71a GEG. Typical parameters are temperature, humidity and air quality.

The objection that this means a large building management system misses the point: the wording requires capabilities, not a system size. What matters is that all six are demonstrably present.

What applies to new buildings under subsection 3?

New non-residential buildings need, in addition to subsection 2, at least automation grade C under DIN/TS 18599-11: 2025-10 where a system under subsection 1 exceeds 70 kW, and at least grade B above 290 kW. The DIN V 18599 pre-standards are currently being replaced by the DIN/TS 2025-10 editions, and Section 56(3) refers expressly to the new edition. The system must be able to communicate with other technical building systems across manufacturers. Technical commissioning management, including adjustment of the building services, must cover at least one heating period and one cooling period. From 01.01.2027 the reference building in Annex 2 No. 9 also assumes building automation class C.

What about systems installed before 2027?

Subsection 4 contains a transitional rule. If a system that does not meet subsection 2 was installed in an existing building within up to three years before 01.01.2027, the owner may upgrade it after 31.12.2029. By our own derivation, this covers installations from 01.01.2024. The wording sets a ten-year period but does not say expressly when it starts, so clarify this before relying on it. Important: subsection 4 covers building automation only. For lighting control under subsection 6, the deadline remains 31.12.2029.

What fine applies, and what does building automation save?

Anyone who, contrary to Section 56(1), fails to equip a non-residential building, does so incorrectly or too late commits an administrative offence under Section 108(1) No. 7 (No. 8 from 01.01.2027), with fines of up to €5,000 (Section 108(2) No. 3). The fine is only part of the picture. From 01.01.2027:

1. wenn das Gebäude mit einem System für die Gebäudeautomatisierung und Gebäudesteuerung nach § 56 Absatz 2 ausgestattet ist oder

§ 74 Abs. 3 Nr. 1 GModG (ab 01.01.2027)

In English: for non-residential buildings, the energy inspection lapses if the building has a system under Section 56(2). From 2027, Section 74(1) requires this inspection for air-conditioning systems above 12 kW and, newly, for ventilation systems above 70 kW; above 70 kW it is due every five years (Section 76). In addition, BEG EM funding (as of 10/2026) supports control technology for building automation of at least class B with a 15% grant. Under Section 89(1) sentence 2 No. 4 GModG, renovation measures are eligible if they exceed the requirements of, among others, Section 56. Your energy efficiency expert confirms whether this applies; see Funding 2026.

How do lighting control and building automation relate?

Subsection 6 opens with "Zusätzlich zu den Anforderungen nach Absatz 2" (in addition to the requirements of subsection 2). Lighting control is therefore a further duty for the same buildings, not a substitute. At the same time, from 01.01.2027 lighting expressly counts as a technical building system:

„gebäudetechnisches System“ die technische Ausrüstung eines Gebäudes oder Gebäudeteils für Raumheizung, Raumkühlung, Lüftung, Warmwasserbereitung für den häuslichen Gebrauch, eingebaute Beleuchtung, Gebäudeautomatisierung und Gebäudesteuerung, Erzeugung von erneuerbarer Energie und Speicherung von Energie am Gebäudestandort oder für eine Kombination derselben, einschließlich Systemen, die Energie aus erneuerbaren Quellen nutzen,

§ 3 Abs. 1 Nr. 10 GModG (ab 01.01.2027)

Built-in lighting ("eingebaute Beleuchtung") is listed. Since subsection 2 No. 1 requires monitoring of "all technical building systems", it seems reasonable to integrate lighting into building automation. With SensMotion, monitoring via the AU-Manager is included in every project and passes lighting data to the building automation via BACnet/IP. This covers lighting under subsection 6 and supplies data for subsection 1. Automation of heating, ventilation and air-conditioning remains a separate part that lighting control does not replace. More: Section 56(6) GModG explained.

This article is not legal advice; the statutory text is authoritative.

What should you do now?

  • Take stock: which meters, controllers and management systems exist, and which of the six functions are missing?
  • Define interfaces: align lighting control, heating, ventilation and air-conditioning on an open protocol.
  • Document the installation date of existing systems in case subsection 4 applies.
  • Secure operation: who analyses the data? A maintenance and energy management contract can take on this role.

Frequently asked questions

Is pure energy monitoring enough for Section 56(1)?

Not necessarily. Subsection 2 also requires adjustment of consumption and monitoring of indoor environmental quality. Check your system against all six functions.

Does lighting control fulfil the building automation duty?

No. It fulfils the duty under subsection 6 and supplies data to the building automation. Automation of heating, ventilation and air-conditioning under subsections 1 and 2 is a separate part.

When can a fine be imposed?

The deadline ends with 31.12.2029. After that, a missing or incomplete system can be fined up to €5,000 under Section 108.

Which interface does the law prescribe?

None in particular, only a common and freely configurable interface for manufacturer-independent analyses. BACnet/IP is a widely used example.

Last reviewed: 18 November 2026. General information, not legal advice. The legal text is authoritative.

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.