Does the lighting control obligation apply to your building?
Four questions, a first assessment in 60 seconds. No sign-up. Print the result or discuss it with us directly.
How to read the result
The trigger is the rated output of the heating, air-conditioning or combined ventilation system, not the lighting. Once the threshold is exceeded, lighting is part of the obligation.
Output counts per system, not per tenant. Separate systems are, on the common interpretation, not added together. Details: the 70 kW threshold explained.
The owner is responsible; for let buildings this is usually the landlord.
What exactly is required: § 56(6) GModG explained.
Frequently asked questions
Where do I find my system's rated output?
On the rating plate of the boiler, heat pump or air-conditioning unit, in the energy certificate or the system documentation. Your maintenance contractor usually knows it. What counts is the output per system.
Does the lighting load count towards the threshold?
No. The trigger is the heating, air-conditioning or combined ventilation system. Once the threshold is exceeded, however, lighting is part of the obligation.
I'm a tenant. Do I need to act?
The obligation lies with the owner, so for let buildings usually the landlord. As a tenant you benefit from lower electricity costs, so it is worth raising it with your landlord.
Is the result binding?
No. The check is a first assessment based on your answers and does not replace legal advice. We're happy to look at your building in detail.
From your question to a finished plan.
Free initial consultation, one contact person.