EU country tracker

EPBD transposition in all 27 EU countries.

The EU buildings directive requires automatic lighting control in non-residential buildings. Here you can see how far member states have got, with sources and review date.

What the EU requiresArticle 13(12) of Directive (EU) 2024/1275: automatic lighting control in non-residential buildings above 290 kW by 31 December 2027 and above 70 kW by 31 December 2029. The transposition deadline was 29 May 2026. On 15 July 2026 the European Commission sent letters of formal notice to all 27 member states.
CountryStatusLighting controlConfidence
AustriapartialVienna (§ 14b WHLKG 2015), Lower Austria (§ 44a NÖ BO 2014) and Tyrol (§ 38(7) TBV): non-residential buildings > 290 kW by 31.12.2027 and > 70 kW by 31.12.2029 with automatic lighting controls (zoned, occupancy detection); Upper Austria (draft): > 290 kW from 01.01.2028, > 70 kW from 01.01.2030; Salzburg: no rule foundmittel
Belgiumdraftnot yet transposed; in Flanders the detailed technical system requirements are to follow later via the Energiebesluit, no text on lighting controls was foundmittel
Bulgariadraftnot yet transposed; not identified in the draft documents foundmittel
Croatiapartialnot yet transposed; no automatic lighting control obligation found in the bill (Oct. 2025)mittel
Cyprusdraftnot yet transposed; content of the bill on lighting controls not checkedmittel
Czechiadraftnot yet transposed; no information on lighting controls in the draft foundmittel
Denmarkdraftnot yet transposed (adoption not confirmed); the draft bill describes the EU requirements > 290 kW by 31.12.2027 and > 70 kW by 31.12.2029 and foresees implementation via delegated rules in BR18niedrig
Estoniadraftnot yet transposed; no information on lighting controls in the draft foundniedrig
Finlanddraftdraft (HE 258/2026, § 13): automatic lighting controls with zoning and occupancy control in non-residential buildings > 290 kW by end of 2027, > 70 kW by end of 2029, exemption where not technically or economically feasible; not yet adoptedmittel
Francepartialnot yet transposed; no automatic lighting control obligation foundmittel
Germanytransposed§ 56(6) GModG: non-residential buildings with heating, air-conditioning or combined ventilation systems > 70 kW rated output must have automatic lighting controls (suitably zoned, with occupancy detection) by 31.12.2029, unless technically impossible or economically unreasonable. A separate > 290 kW stage by 31.12.2027 was not adopted.hoch
Greeceopennot yet transposedmittel
Hungaryopennot yet transposedniedrig
Irelandpartialnot yet transposed; no amendment to Part L on lighting controls foundmittel
Italyopennot yet transposedmittel
Latviadraftnot yet transposed; according to reporting, the draft does not mention lighting controlsmittel
Lithuaniapartialnot yet transposed; no national rule foundniedrig
Luxembourgpartialnot yet transposed; no rule foundniedrig
Maltaopennot yet transposedniedrig
NetherlandstransposedBbl Art. 3.145/3.147 and 4.160c/4.160e: non-residential buildings with heating/air-conditioning > 290 kW must have automatic lighting control (suitably zoned, occupancy detection) from 01.01.2028; threshold drops to > 70 kW from 01.01.2030hoch
Polanddraftnot yet transposed; not mentioned in the sources found on the draftsniedrig
Portugalpartialnot yet transposed; no rule foundmittel
Romaniapartialnot yet transposedniedrig
Slovakiatransposed§ 8(12) Act 555/2005 as amended: owners of non-residential buildings must, where technically and economically feasible, install automatic control of built-in lighting by 31.12.2027 for > 290 kW and by 31.12.2029 for > 70 kW rated output of the technical building systemhoch
Sloveniaopennot yet transposedniedrig
Spaindraftdraft CTE DB-HE 3: automatic lighting controls with occupancy detection in buildings with heating, air-conditioning or ventilation systems > 290 kW (per trade sources); 70 kW stage and deadlines not identifiedmittel
SwedentransposedBFS 2026:9 ch. 4 § 2 (existing non-residential buildings): control system with automatic lighting control with occupancy detection and zoning for systems > 290 kW from 01.01.2028 (BFS 2026:14), > 70 kW from 01.01.2030 (BFS 2026:16)hoch

As of 18 November 2026. No guarantee, not legal advice. National legal texts are authoritative. We welcome tips on new transpositions.

Austria partial

In Austria, transposition is carried out by the federal states. Vienna, Lower Austria and Tyrol have adopted the automatic lighting control obligation for non-residential buildings above 290 kW by 31.12.2027 and above 70 kW by 31.12.2029; Upper Austria has a draft with 2028/2030 dates. No such rule was found in Salzburg, and the remaining states were not fully checked (as of November 2026).

Legal act
Umsetzung durch die Länder (OIB-Richtlinie 6, Ausgabe September 2025, plus Landesrecht). Wien: Wiener EU-Gebäuderichtlinie-Umsetzungsgesetz 2026, LGBl. Nr. 25/2026 (in Kraft 15.07.2026). Niederösterreich: NÖ BO 2014 § 44a i. d. F. LGBl. Nr. 1/2026 (in Kraft 29.05.2026). Tirol: Änderung der Technischen Bauvorschriften 2016, LGBl. Nr. 59/2026 (kundgemacht 15.07.2026). Oberösterreich: Entwurf Oö. BauTV-Novelle 2026 (Stand 19.08.2026). Salzburg: Bautechnikgesetz 2015 ohne Beleuchtungsregel. Übrige Länder nicht geprüft.
Lighting control
Vienna (§ 14b WHLKG 2015), Lower Austria (§ 44a NÖ BO 2014) and Tyrol (§ 38(7) TBV): non-residential buildings > 290 kW by 31.12.2027 and > 70 kW by 31.12.2029 with automatic lighting controls (zoned, occupancy detection); Upper Austria (draft): > 290 kW from 01.01.2028, > 70 kW from 01.01.2030; Salzburg: no rule found
Building automation
Vienna, Lower Austria, Tyrol: building automation > 290 kW, > 70 kW by 31.12.2029; Salzburg (§ 37 BauTG 2015): > 290 kW
Confidence
mittel

Deadlines

  • 31 December 2027: Lighting controls > 290 kW (Vienna, Lower Austria, Tyrol)
  • 31 December 2029: Lighting controls and building automation > 70 kW (Vienna, Lower Austria, Tyrol)

Sources

Belgium draft

As of November 2026, Belgium is transposing the recast EPBD at regional level. Flanders has tabled a draft decree that was reviewed in summer 2026; BACS requirements there were already taken over by an omnibus decree, but no rule on automatic lighting controls exists yet. Wallonia has a draft decree, and no transposing act was found for Brussels.

Legal act
Zuständig sind die Regionen. Flandern: Entwurf eines Dekrets zur Umsetzung der Richtlinie (EU) 2024/1275 (Vlaamse Regering, Begründung VR 2026 1707 DOC.0851/3BIS vom 17.07.2026; Stellungnahme Minaraad/SERV vom 27./31.08.2026); BACS-Teil von Art. 13 bereits per Verzameldecreet I (B.S. 11.03.2026). Wallonien: Dekretentwurf (Stellungnahme CESE Wallonie), laut Energie+ bis August 2026 nicht im Moniteur belge veröffentlicht. Brüssel: kein Umsetzungsakt gefunden.
Lighting control
not yet transposed; in Flanders the detailed technical system requirements are to follow later via the Energiebesluit, no text on lighting controls was found
Building automation
Flanders: Art. 13 EPBD BACS provisions already taken over via Verzameldecreet I (B.S. 11.03.2026) according to the explanatory memorandum; basic > 290 kW obligation from EPBD 2018 already in place in all three regions (secondary source)
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Bulgaria draft

As of November 2026, Bulgaria has not transposed the recast EPBD. The Ministry of Energy has published a draft amendment to the Energy Efficiency Act, with consultation running until 11.09.2026. Whether the draft contains an automatic lighting control obligation could not be determined.

Legal act
Entwurf eines Gesetzes zur Änderung und Ergänzung des Energieeffizienzgesetzes (ЗИД на ЗЕЕ) zur Umsetzung der Richtlinien (EU) 2023/1791 und 2024/1275, öffentliche Konsultation auf strategy.bg bis 11.09.2026
Lighting control
not yet transposed; not identified in the draft documents found
Building automation
no information found on the draft
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Croatia partial

Croatia transposed parts of the recast EPBD through the Act on Energy Efficiency in Buildings (NN 155/2025, in force since 01.01.2026). The Act requires building automation for non-residential buildings above 290 kW. No automatic lighting control obligation was found in the bill text reviewed (as of November 2026).

Legal act
Zakon o energetskoj učinkovitosti u zgradarstvu (NN 155/2025), in Kraft 01.01.2026, setzt laut Gesetzentwurf die Richtlinie (EU) 2024/1275 um
Lighting control
not yet transposed; no automatic lighting control obligation found in the bill (Oct. 2025)
Building automation
Art. 20: owners of non-residential buildings with systems > 290 kW must install building automation (exemption where not technically/economically feasible); 70 kW stage not found
Confidence
mittel

Deadlines

  • 01 January 2026: Act on Energy Efficiency in Buildings enters into force
  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Cyprus draft

As of November 2026, Cyprus has not transposed the recast EPBD. A new Energy Performance of Buildings Bill was tabled in parliament on 17.09.2026. Whether it contains an automatic lighting control obligation could not be checked.

Legal act
Regulation of the Energy Performance of Buildings Bill 2026 (Akte 23.01.067.145-2026), am 17.09.2026 im Repräsentantenhaus eingebracht; Verabschiedung nicht bestätigt
Lighting control
not yet transposed; content of the bill on lighting controls not checked
Building automation
no information found
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Czechia draft

As of November 2026, Czechia has not transposed the recast EPBD. In September 2026 the Ministry of Industry and Trade presented a draft amendment to the Energy Management Act, which by its own account does not go beyond the directive. Whether it contains an automatic lighting control obligation could not be determined.

Legal act
Entwurf einer Novelle des Gesetzes Nr. 406/2000 Sb. über die Energiewirtschaft (MPO, September 2026), Ressortabstimmung bis 20.10.2026; Durchführungsverordnungen sollen folgen
Lighting control
not yet transposed; no information on lighting controls in the draft found
Building automation
no information found on the draft
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Denmark draft

As of November 2026, Denmark has a draft amendment to the Building Act and a draft amendment to the BR18 building regulations, both planned to enter into force on 29.05.2026. Final adoption could not be confirmed. Lighting controls are to be regulated by delegated rules in BR18.

Legal act
Entwurf Lov om ændring af byggeloven (Gennemførelse af dele af direktiv (EU) 2024/1275), Version vom 15.12.2025, geplantes Inkrafttreten 29.05.2026; Entwurf einer Änderungsbekanntmachung zum Bygningsreglement BR18 (Høring 16.02.–17.03.2026, geplant ab 29.05.2026). Endgültige Verabschiedung nicht bestätigt.
Lighting control
not yet transposed (adoption not confirmed); the draft bill describes the EU requirements > 290 kW by 31.12.2027 and > 70 kW by 31.12.2029 and foresees implementation via delegated rules in BR18
Building automation
current BR18 (§ 395): building automation for heating/cooling demand > 290 kW in new and existing non-residential buildings; lowering to 70 kW foreseen in the draft
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Estonia draft

As of November 2026, Estonia has not transposed the recast EPBD. According to secondary sources, a draft amendment to the Building Code is in preparation, but its wording could not be checked. No national information on automatic lighting controls was found.

Legal act
Entwurf zur Änderung des Ehitusseadustik (Baugesetzbuch) und weiterer Gesetze zur Umsetzung der Richtlinie (EU) 2024/1275, laut Sekundärquellen im Herbst 2026 in Ressortabstimmung; Energieeffizienzkapitel des EhS verweist laut einer Quelle (Oktober 2026) noch auf Richtlinie 2010/31/EU
Lighting control
not yet transposed; no information on lighting controls in the draft found
Building automation
no information found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Finland draft

As of November 2026, Finland has government bill HE 258/2026 before parliament, which would introduce automatic lighting controls for non-residential buildings above 290 kW by end of 2027 and above 70 kW by end of 2029. The building automation obligation would be extended to systems above 70 kW from 01.01.2029. The law has not yet been adopted.

Legal act
Regierungsentwurf HE 258/2026 vp zur Änderung des Gesetzes 733/2020 über Ladepunkte sowie Automations- und Steuerungssysteme in Gebäuden (unterzeichnet 15.10.2026), im Parlament; daneben HE 164/2026 vp (neues Gebäudeenergieeffizienzgesetz, Ausschussbericht YmVM 14/2026 vom 10.11.2026 empfiehlt unveränderte Annahme, ohne Beleuchtungsregel)
Lighting control
draft (HE 258/2026, § 13): automatic lighting controls with zoning and occupancy control in non-residential buildings > 290 kW by end of 2027, > 70 kW by end of 2029, exemption where not technically or economically feasible; not yet adopted
Building automation
current Act 733/2020 (§ 13): automation and control system > 290 kW by 31.12.2024; draft HE 258/2026 (§ 11): extension to > 70 kW from 01.01.2029
Confidence
mittel

Deadlines

  • 31 December 2027: Draft HE 258/2026: lighting controls > 290 kW (not yet adopted)
  • 01 January 2029: Draft HE 258/2026: building automation > 70 kW (not yet adopted)
  • 31 December 2029: Draft HE 258/2026: lighting controls > 70 kW (not yet adopted)

Sources

France partial

France has transposed parts of Art. 13 EPBD by decree, including postponing the BACS obligation for existing non-residential buildings above 70 kW to 01.01.2030 (Décret 2025-1343). No automatic lighting control obligation was found. According to the sources found, the DDADUE omnibus bill with further partial transposition had not yet been adopted (as of November 2026).

Legal act
Décret n° 2025-1343 du 26 décembre 2025 (JORF n° 0303 du 27.12.2025), erlassen in Anwendung von Art. 13 der Richtlinie (EU) 2024/1275 (Verschiebung BACS-Fristen); Arrêté du 11 juin 2026 (DPE); Projet de loi DDADUE (Sénat angenommen 18.02.2026, Assemblée nationale n° 2518) mit Teilumsetzung der EPBD, Verabschiedung nicht bestätigt
Lighting control
not yet transposed; no automatic lighting control obligation found
Building automation
BACS decree (Art. R. 175-2 et seq. CCH): > 290 kW since 01.01.2025; existing tertiary buildings > 70 kW postponed from 01.01.2027 to 01.01.2030 by Décret 2025-1343
Confidence
mittel

Deadlines

  • 01 January 2030: BACS obligation for existing non-residential buildings > 70 kW (Décret 2025-1343)
  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Germany transposed

Germany transposed the recast EPBD through the Buildings Modernisation Act (BGBl. 2026 I No. 226), in force since 29.07.2026. Under § 56(6) GModG, non-residential buildings with systems above 70 kW must have zoned automatic lighting controls with occupancy detection by 31.12.2029. The directive's earlier stage above 290 kW by 31.12.2027 was not adopted separately (as of November 2026).

Legal act
Gesetz zur Änderung des Gebäudeenergiegesetzes, zur Änderung des Gebäude-Elektromobilitätsinfrastruktur-Gesetzes und zur Änderung weiterer Vorschriften im Wärmebereich vom 23.07.2026 (BGBl. 2026 I Nr. 226, ausgegeben 28.07.2026); GEG umbenannt in Gebäudemodernisierungsgesetz (GModG), in Kraft 29.07.2026 (einzelne Artikel ab 01.01.2027, 01.01.2028, 01.01.2030)
Lighting control
§ 56(6) GModG: non-residential buildings with heating, air-conditioning or combined ventilation systems > 70 kW rated output must have automatic lighting controls (suitably zoned, with occupancy detection) by 31.12.2029, unless technically impossible or economically unreasonable. A separate > 290 kW stage by 31.12.2027 was not adopted.
Building automation
§ 56(1)-(3) GModG: building automation > 70 kW by 31.12.2029; new buildings automation class B (> 290 kW) or C (> 70 kW) per DIN/TS 18599-11:2025-10; transitional rule for systems installed up to three years before 01.01.2027 (§ 56(4))
Confidence
hoch

Deadlines

  • 29 July 2026: GModG enters into force (base version)
  • 31 December 2029: Automatic lighting controls and building automation in non-residential buildings > 70 kW (§ 56(1) and (6) GModG)

Sources

Greece open

As of November 2026, no act transposing the recast EPBD was found for Greece. Trade sources report that no such law had been adopted by August 2026. There is no national rule on automatic lighting controls.

Legal act
kein Umsetzungsakt gefunden; laut Fachpresse bis August 2026 kein Gesetz verabschiedet, Revision des KENAK angekündigt
Lighting control
not yet transposed
Building automation
no information found
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Hungary open

As of November 2026, no act transposing the recast EPBD was found for Hungary. According to an environmental NGO, the relevant decree 9/2023 ÉKM still referred to the earlier directives in April 2026. There is no national rule on automatic lighting controls.

Legal act
kein Umsetzungsakt und kein Entwurf gefunden; Verordnung 9/2023 (V. 25.) ÉKM verweist laut NGO-Leaflet (Stand April 2026) noch auf die Richtlinien von 2010/2018
Lighting control
not yet transposed
Building automation
no information found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Ireland partial

Ireland transposed parts of the recast EPBD on energy certificates (BER, class A0) through S.I. 168/2026 and S.I. 195/2026, effective 24.05.2026. No automatic lighting control obligation was found. According to trade press, the update of the building regulations (Part L) is still pending (as of November 2026).

Legal act
S.I. No. 168/2026 European Union (Energy Performance of Buildings) Regulations 2026 und S.I. No. 195/2026 (No. 2) Regulations 2026, jeweils Änderung von S.I. 243/2012, wirksam ab 24.05.2026 (Teilumsetzung u. a. Art. 11 und 19: BER-Skala, Klasse A0)
Lighting control
not yet transposed; no amendment to Part L on lighting controls found
Building automation
not covered by the S.I.s found; national BACS provision not checked
Confidence
mittel

Deadlines

  • 24 May 2026: S.I. 168/2026 and 195/2026 take effect (energy certificates/BER)
  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Italy open

As of November 2026, Italy has not transposed the recast EPBD. A transposing decree can only be adopted after the 2026 European Delegation Law is passed, and no draft has been published. There is no national rule on automatic lighting controls.

Legal act
kein Umsetzungsakt und kein veröffentlichter Entwurf eines decreto legislativo; MASE hat Grundsätze für die Aufnahme in das Europäische Delegationsgesetz 2026 an das Parlament übermittelt (Stand Oktober 2026)
Lighting control
not yet transposed
Building automation
current framework D.Lgs. 192/2005; no new rule found
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Latvia draft

As of November 2026, Latvia has not transposed the recast EPBD. A draft amendment to the Building Energy Efficiency Law has been before parliament since October 2026. According to the sources found, it contains no rule on automatic lighting controls.

Legal act
Gesetzentwurf Grozījumi Ēku energoefektivitātes likumā (Wirtschaftsministerium), am 08.10.2026 an den Saeima-Ausschuss überwiesen
Lighting control
not yet transposed; according to reporting, the draft does not mention lighting controls
Building automation
draft: building automation and control systems to be considered in the energy performance assessment; no thresholds found
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Lithuania partial

In June 2026, Lithuania amended its Construction Law, transposing parts of the recast EPBD such as zero-emission building requirements from 2028/2030. No automatic lighting control obligation was found. Technical regulations (STR) are still being revised (as of November 2026).

Legal act
Änderung des Baugesetzes (Statybos įstatymas), Gesetz Nr. XV-1034 vom 11.06.2026 (vom Seimas am 11./12.06.2026 angenommen), Teilumsetzung u. a. Nullemissionsgebäude; Änderung STR 2.01.02:2016 in Vorbereitung
Lighting control
not yet transposed; no national rule found
Building automation
no new national rule found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Luxembourg partial

Luxembourg transposed individual articles of the recast EPBD through a law and a grand-ducal regulation on heat pumps of 17.08.2026. Further parts are in parliamentary procedures. No automatic lighting control obligation was found (as of November 2026).

Legal act
Loi du 17 août 2026 concernant l'exploitation des pompes à chaleur und Règlement grand-ducal du 17 août 2026 relatif aux modalités d'exploitation des pompes à chaleur (Umsetzung u. a. Art. 23, 24, 27, 29 EPBD); weitere Gesetzentwürfe (u. a. Dossier parlementaire 8585) mit Teilumsetzung
Lighting control
not yet transposed; no rule found
Building automation
no information found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Malta open

As of November 2026, neither a transposing act nor a published draft for the recast EPBD was found for Malta. Malta is among the member states that received a letter of formal notice from the Commission in July 2026. There is no national rule on automatic lighting controls.

Legal act
kein Umsetzungsakt und kein Entwurf gefunden
Lighting control
not yet transposed
Building automation
no information found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Netherlands transposed

The Netherlands included the automatic lighting control obligation in the Besluit bouwwerken leefomgeving through the first transposition tranche (Stb. 2026, 103). Non-residential buildings with systems above 290 kW must have zoned lighting control with occupancy detection from 01.01.2028, and those above 70 kW from 01.01.2030. The national dates thus fall one day after the EU deadlines of 31.12.2027 and 31.12.2029 (as of November 2026).

Legal act
Besluit van 21 april 2026 tot wijziging van het Besluit bouwwerken leefomgeving, het Besluit kwaliteit leefomgeving en het Omgevingsbesluit (eerste tranche implementatie richtlijn (EU) 2024/1275), Stb. 2026, 103 (veröffentlicht 07.05.2026), überwiegend in Kraft 29.05.2026; dazu Omgevingsregeling-Änderung Stcrt. 2026, 18123
Lighting control
Bbl Art. 3.145/3.147 and 4.160c/4.160e: non-residential buildings with heating/air-conditioning > 290 kW must have automatic lighting control (suitably zoned, occupancy detection) from 01.01.2028; threshold drops to > 70 kW from 01.01.2030
Building automation
building automation (GACS) > 290 kW already in force; threshold > 70 kW from 01.01.2030; indoor air quality monitoring added from 29.05.2026
Confidence
hoch

Deadlines

  • 29 May 2026: First tranche enters into force (Stb. 2026, 103)
  • 01 January 2028: Automatic lighting control in non-residential buildings > 290 kW
  • 01 January 2030: Lighting control and GACS in non-residential buildings > 70 kW

Sources

Poland draft

As of November 2026, Poland has not transposed the recast EPBD. According to trade press, a draft act on building energy performance and a draft of new technical building regulations are in the legislative process. No rule on automatic lighting controls was identified in the sources found.

Legal act
Kein Umsetzungsgesetz verabschiedet. Laut Fachpresse (05.11.2026) Entwurf zur Änderung des Gesetzes über die Gesamtenergieeffizienz von Gebäuden und des Baurechts (UC82, RCL 12347353) sowie Entwurf neuer technischer Bauvorschriften (WT 2026) im Verfahren; Vorkonsultation des MRiT zu Art. 14 EPBD
Lighting control
not yet transposed; not mentioned in the sources found on the drafts
Building automation
according to trade press the draft provides for BACS in non-residential buildings; no thresholds/deadlines found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Portugal partial

Portugal transposed parts of the recast EPBD early through Decreto-Lei 11/2025. According to a secondary source, no further transposing act had been adopted by the 29.05.2026 deadline. No automatic lighting control obligation was found (as of November 2026).

Legal act
Decreto-Lei n.º 11/2025 vom 19.02.2025 (zweite Änderung des Decreto-Lei n.º 101-D/2020), Teilumsetzung der Richtlinie (EU) 2024/1275; laut Sekundärquelle (Juli 2026) kein weiterer Umsetzungsakt bis zur Frist
Lighting control
not yet transposed; no rule found
Building automation
no new rule transposing Art. 13 found
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Romania partial

Romania has so far transposed only individual provisions of the recast EPBD, in particular the ban on subsidies for fossil fuel boilers through Government Ordinance 16/2025. A comprehensive amendment of building energy law 372/2005 is in preparation, but no text was found. There is no rule on automatic lighting controls (as of November 2026).

Legal act
Ordonanța Guvernului nr. 16/2025 (Umsetzung von Art. 17 Abs. 15 EPBD, Förderverbot für fossile Heizkessel; vom Verfassungsgericht im Juli 2026 bestätigt); Entwurf des MDLPA zur Änderung des Gesetzes 372/2005 laut Sekundärquelle (April 2026) noch nicht veröffentlicht
Lighting control
not yet transposed
Building automation
no new rule found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Slovakia transposed

Slovakia transposed Art. 13(12) EPBD almost verbatim through Act 246/2026 Coll., which enters into force on 01.01.2027. Non-residential buildings with technical building systems above 290 kW must have automatic control of built-in lighting by 31.12.2027, and those above 70 kW by 31.12.2029. The obligation applies where technically and economically feasible (as of November 2026).

Legal act
Zákon č. 246/2026 Z. z. vom 15.09.2026 zur Änderung des Gesetzes Nr. 555/2005 Z. z. über die Gesamtenergieeffizienz von Gebäuden, verkündet 08.10.2026, in Kraft 01.01.2027
Lighting control
§ 8(12) Act 555/2005 as amended: owners of non-residential buildings must, where technically and economically feasible, install automatic control of built-in lighting by 31.12.2027 for > 290 kW and by 31.12.2029 for > 70 kW rated output of the technical building system
Building automation
no new BACS threshold found in the amending act; not checked in detail
Confidence
hoch

Deadlines

  • 01 January 2027: Act 246/2026 enters into force
  • 31 December 2027: Automatic lighting control in non-residential buildings > 290 kW
  • 31 December 2029: Automatic lighting control in non-residential buildings > 70 kW

Sources

Slovenia open

As of November 2026, no act and no published draft transposing the recast EPBD was found for Slovenia. The government's 2026 legislative programme lists transposition as an open task. There is no national rule on automatic lighting controls.

Legal act
kein Umsetzungsakt und kein aktueller Entwurf gefunden; im Normativprogramm der Regierung 2026 (Stand Juli 2026) als offene Umsetzungsaufgabe genannt
Lighting control
not yet transposed
Building automation
no information found
Confidence
niedrig

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Spain draft

As of November 2026, Spain has only partly transposed the recast EPBD; the Spanish Green Building Council estimated about 60 % in May 2026. The draft amendment of the Código Técnico de la Edificación provides for automatic lighting controls in DB-HE 3, but its adoption was not confirmed. The amendment of the RITE thermal installations regulation is still pending.

Legal act
Proyecto de Real Decreto por el que se modifica el Código Técnico de la Edificación (Anhörung 07.11.–09.12.2025), Endgültige Verabschiedung nicht bestätigt; RITE-Änderung ohne veröffentlichten Entwurf (Vorkonsultation April 2025); laut GBCE (Mai 2026) rund 60 % Umsetzungsgrad
Lighting control
draft CTE DB-HE 3: automatic lighting controls with occupancy detection in buildings with heating, air-conditioning or ventilation systems > 290 kW (per trade sources); 70 kW stage and deadlines not identified
Building automation
RITE (RD 178/2021) transposes EPBD 2018; new Art. 13 requirements still pending
Confidence
mittel

Deadlines

  • 31 December 2027: EU requirement Art. 13(12)(a) EPBD: automatic lighting controls > 290 kW (not yet transposed nationally)
  • 31 December 2029: EU requirement Art. 13(12)(b) EPBD: automatic lighting controls > 70 kW (not yet transposed nationally)

Sources

Sweden transposed

Sweden transposed the automatic lighting control obligation through regulations of the National Board of Housing, Building and Planning (BFS 2026:14 and 2026:16 amending BFS 2026:9). Existing non-residential buildings with systems above 290 kW must have zoned lighting control with occupancy detection from 01.01.2028, and those above 70 kW from 01.01.2030. The national dates thus fall one day after the EU deadlines (as of November 2026).

Legal act
Boverkets föreskrifter BFS 2026:9 om energihushållning och värmeisolering i byggnader, geändert durch BFS 2026:14 (in Kraft 01.01.2028) und BFS 2026:16 (in Kraft 01.01.2030), beide beschlossen 25.08.2026; Gesetzesänderungen gemäß Prop. 2025/26:159 (u. a. Energiedeklaration, PBL) ab 01.07.2026
Lighting control
BFS 2026:9 ch. 4 § 2 (existing non-residential buildings): control system with automatic lighting control with occupancy detection and zoning for systems > 290 kW from 01.01.2028 (BFS 2026:14), > 70 kW from 01.01.2030 (BFS 2026:16)
Building automation
same provisions: monitoring, benchmarking, interoperability and indoor environment monitoring > 290 kW from 01.01.2028, > 70 kW from 01.01.2030; existing building automation obligation > 290 kW since 2025
Confidence
hoch

Deadlines

  • 01 January 2028: Automatic lighting control in non-residential buildings > 290 kW (BFS 2026:14)
  • 01 January 2030: Automatic lighting control in non-residential buildings > 70 kW (BFS 2026:16)

Sources

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.