- Threshold
- rated output of more than 70 kW per system (Section 56(1) and (6) GModG)
- Systems
- heating, air conditioning or combined heating/air-conditioning and ventilation (Section 56(1) GModG)
- Deadline
- 31 December 2029 (Section 56(1) and (6) GModG)
- New buildings
- automation class C above 70 kW, class B above 290 kW (Section 56(3) GModG)
- Responsible party
- developer or owner (Section 8 GModG)
How does the 70 kW threshold work?
Section 56(1) GModG is tied to the rated output of the systems that heat or cool a non-residential building. It covers a heating system, an air-conditioning system or a combined heating/air-conditioning and ventilation system with a rated output of more than 70 kW. For these buildings, paragraph 1 requires building automation by 31 December 2029, and paragraph 6 requires automatic lighting control by the same date. Details on paragraph 6: Section 56(6) GModG.
Three points decide the assessment:
- The threshold applies per system. What matters is the individual heating, air-conditioning or combined system.
- It does not apply per tenant or per part of the building. If one central system serves several tenancies, its full rated output counts.
- The wording says more than 70 kW. A system rated at exactly 70 kW is not above the threshold on the wording.
You will usually find the rated output on the rating plate or in the data sheet of the heat or cooling generator. Otherwise, a building services engineer can determine it.
Which outputs are added together?
Where a building has several generators, the question is whether their outputs are combined. According to a widely held interpretation, including that of the GEG project group (Projektgruppe GEG) and the German Energy Agency (dena):
- Generators forming an integrated system are added, for example two boilers jointly supplying one heating network.
- Separate systems are not added, for example two independent heating systems for two parts of a building.
- Heating and cooling are never added.
This interpretation is useful for an initial assessment; where in doubt, the statutory text prevails. In borderline cases, document which generators feed which network and whether the networks can genuinely run separately.
What role does lighting play?
The lighting load is not the trigger for the obligation. The trigger is solely the heating, air-conditioning or combined system. A hall with many luminaires but a small heating system is not caught because of its lighting alone.
Conversely, once the threshold is exceeded, the lighting is fully part of the obligation. The building then needs automatic lighting control which, under paragraph 6 sentence 2, should by default be appropriately zoned and include occupancy detection. The law does not require new luminaires. Existing LED luminaires with dimmable drivers can usually be retrofitted; with SensMotion, this is done wirelessly without new control cabling. More in Retrofitting lighting control on existing luminaires.
Owner or tenant: who has to act?
Under Section 8 GModG, the developer or owner is responsible. In let buildings, this is usually the landlord, not the tenant. Because the threshold applies per system rather than per tenant, a multi-let building can be affected even if each individual tenancy is small.
Tenants are still involved: the work takes place in their premises, and zones, operating hours and background lighting should suit their use. The lease can set out how costs and coordination are shared. The obligations under Section 56 can also become relevant in acquisitions, due diligence and financing.
Existing or new building: what does paragraph 3 say?
For existing non-residential buildings above 70 kW, the deadline of 31 December 2029 applies to both building automation and lighting control.
For new non-residential buildings, paragraph 3 sets additional building automation requirements:
- above 70 kW, at least automation class C,
- above 290 kW, automation class B,
- in each case according to the German standard series DIN 18599 part 11, together with technical commissioning management.
The GModG already refers to DIN/TS 18599-11:2025-10 in Section 56(3), and from 1 January 2027 DIN/TS 18599:2025-10 also replaces DIN V 18599:2018-09 in the energy balance. Other rules, such as the BEG EM funding guideline, still cite DIN V. For building automation already in place, paragraph 4 contains a transitional rule: systems installed up to three years before 1 January 2027 are given ten years to be upgraded. Details are in the Act.
Quick check: is your building affected?
- Is it a non-residential building, such as a warehouse, factory, office or shop?
- Which heating, air-conditioning or combined heating/air-conditioning and ventilation systems are there, and what is the rated output of each?
- Do several generators feed into the same system? Then they are added, under the widely held interpretation.
- Is at least one system above 70 kW? Then building automation and lighting control apply by 31 December 2029.
- Are you the owner? If not, the obligation usually lies with the landlord.
- Is the building newly constructed? Then the requirements of paragraph 3 also apply.
- Could installation be technically impossible or economically unreasonable? See Exemption: economically unreasonable.
The online obligation check walks you through these questions.
Example cases (illustrative)
| Example | Systems | Assessment under the widely held interpretation |
|---|---|---|
| Warehouse with one heating system | one gas boiler, 120 kW | above 70 kW, affected |
| Office building with boiler cascade | two boilers of 40 kW each in one shared heating network | integrated system, 80 kW combined, affected |
| Commercial building with two sections | two separate heating systems of 50 kW each | separate systems, not added, each below 70 kW |
| Retail unit with heating and air conditioning | heating 60 kW, air conditioning 50 kW | heating and cooling never added, each below 70 kW |
| Production hall with extensive lighting | heating 65 kW, lighting load considerably higher | lighting is not the trigger, system below 70 kW |
| Multi-let building | one central heating system, 150 kW, five tenancies | per system, not per tenant, affected (usually the landlord) |
Frequently asked questions
Does the lighting load count towards the 70 kW threshold?
No, the trigger is the heating, air-conditioning or combined system. Once that threshold is exceeded, however, the lighting is fully part of the obligation under Section 56(6) GModG.
Are several boilers added together?
According to a widely held interpretation, yes, if they form part of an integrated system. Separate systems are not added, and heating and cooling never are.
I rent a small unit. Am I affected?
Under Section 8 GModG, the obligation lies with the owner, which in let buildings is usually the landlord. Because the threshold applies per system, the building can be affected even if your unit is small.
Does the 31 December 2029 deadline also apply to new buildings?
For new buildings, Section 56(3) GModG sets its own requirements: at least automation class C above 70 kW, class B above 290 kW, plus technical commissioning management. How paragraphs 3 and 6 interact for new buildings should be checked against the statutory text.
What if my system is rated at exactly 70 kW?
The wording requires more than 70 kW. Check, however, whether other generators belong to the same integrated system, as these are added under the widely held interpretation.
Last reviewed: 18 November 2026. General information, not legal advice. The legal text is authoritative.