Law & obligations

EnEfG and EED: energy audits, implementation plans and lighting

Updated 18 November 20266 min readSensMotion editorial team
In shortUnder Germany's current Energy Efficiency Act (EnEfG), companies consuming more than 7.5 GWh of final energy a year need an energy or environmental management system, and above 2.5 GWh they must draw up and publish implementation plans for every measure identified as economic. Lighting control can be one of those measures, particularly where operating hours are long. Bill 21/8027 would move the thresholds to 23.6 GWh and 2.77 GWh, but as of November 2026 it has not been passed.
At a glance
Energy or environmental management system
above 7.5 GWh total final energy consumption (Section 8(1) EnEfG, current version)
Implementation plans
above 2.5 GWh, for all economic measures (Section 9(1) EnEfG)
Economic
positive net present value within at most 50 % of the service life, measures up to 15 years (Section 9(1) EnEfG, DIN EN 17463)
EU requirement
management system above 85 TJ by 11 Oct 2027, energy audit above 10 TJ by 11 Oct 2026 (Art. 11 Directive (EU) 2023/1791)
Amending bill
Bundestag printed paper 21/8027, first reading 24 Sep 2026, hearing 5 Oct 2026, not passed as of November 2026

What applies today under the German EnEfG and EDL-G?

The EnEfG (Energieeffizienzgesetz) looks at a company's average annual total final energy consumption over the last three completed calendar years, including electricity for lighting. Two thresholds matter:

  • Above 7.5 GWh (Section 8 EnEfG): an energy or environmental management system is mandatory. Companies above the threshold by 17 November 2023 had to set it up by 18 July 2025, later entrants have 20 months. The system must identify feasible saving measures and assess their economics under DIN EN 17463.
  • Above 2.5 GWh (Section 9 EnEfG): for every saving measure identified as economic, the company must publish a concrete, workable implementation plan within three years of its (re)certification or energy audit. Certifiers, environmental verifiers or energy auditors confirm the plans beforehand.

Under the German Energy Services Act (EDL-G), companies that are not SMEs must also carry out an energy audit at least every four years, unless they run an energy or environmental management system.

What does the EU Energy Efficiency Directive (EED) require?

The recast EED, Directive (EU) 2023/1791, ties Article 11 to energy consumption rather than company size:

  • Above 85 TJ (equivalent to 23.6 GWh) on average over the previous three years: a certified energy management system by 11 October 2027.
  • Above 10 TJ (about 2.78 GWh) without a management system: a first energy audit by 11 October 2026, then at least every four years.
  • Action plan: companies turn the audit recommendations into a concrete, workable action plan. Action plans and the implementation rate are to appear in the annual report.

The transposition deadline ended on 10 October 2025. For the public sector, Article 6 also requires 3 % of the floor area of heated or cooled public buildings above 250 m² to be renovated each year.

What would bill 21/8027 change?

The government bill of 16 September 2026 completes EED transposition and cuts German rules back to the EU minimum. For companies, it provides:

PointCurrent German lawBill 21/8027
Management systemabove 7.5 GWh (Section 8 EnEfG)above 23.6 GWh, deadline 11 Oct 2027 if status reached by 31 Dec 2025
Energy auditnon-SMEs, every four years (Section 8 EDL-G)above 2.77 GWh, every four years
Implementation plansabove 2.5 GWh, within three years (Section 9 EnEfG)above 2.77 and below 23.6 GWh, within three months of the audit
Economic test50 % of service life, up to 15 yearsunchanged

Companies with a management system would be exempt from implementation plans. Plans would have to be updated annually and acknowledged by management.

As of November 2026, the bill has not been passed (first reading 24 September 2026, committee hearing 5 October 2026). Until it enters into force, the current thresholds apply. This article is not legal advice; the statutory text is authoritative.

Where does lighting control show up in an energy audit?

In warehouses, halls and offices with long operating hours, lighting is regularly a significant energy use. Typical measures: occupancy control, daylight dimming, limiting excessive illuminance.

Whether lighting control passes the Section 9 test depends on investment, operating hours, occupancy and the service life applied. As a guide, the LBNL meta-analysis reports average savings of 24 % from occupancy control and 28 % from daylight control, and 38 % for combinations. Warehouses and halls with low occupancy can reach up to 75 %, depending on the project. Effects multiply rather than add up. How to calculate this robustly is covered in calculating and verifying savings.

A common objection: the EnEfG requires plans, not implementation. True, but the plans are published and externally confirmed, and BAFA (the Federal Office for Economic Affairs and Export Control) can check them. For buildings above 70 kW, the duty to install comes from building law anyway.

How does the EnEfG relate to Section 56 GModG?

The GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz, sometimes abbreviated GMG) has applied since 29 July 2026. Section 56(6) requires non-residential buildings whose heating, air-conditioning or combined system has a rated output of more than 70 kW to be fitted with automatic lighting control by 31 December 2029, unless this is technically impossible or economically unreasonable.

The two German laws start from different points:

  • Trigger: the EnEfG looks at company energy consumption, the GModG at the rated output of a building's system, see the 70 kW threshold.
  • Responsible party: the company under the EnEfG, the owner under the GModG (Section 8), usually the landlord for let buildings. For owner-occupied halls, both coincide.
  • Economic test: the EnEfG requires a positive net present value within half of the service life at most. The GModG asks, in essence, whether the costs can be recovered from the savings within the usual service life (Section 5 GModG). Our assessment: a measure that passes the stricter EnEfG test will usually also be reasonable under the GModG. Conversely, failing the EnEfG test does not in itself create an exemption under Section 56, see economically unreasonable.

Audit data is a good basis for planning and documenting the obligation under Section 56(6) GModG.

What should companies do now?

  • Determine final energy consumption for the last three calendar years and compare it with current and proposed thresholds.
  • Have lighting assessed zone by zone in the next audit, using real operating hours and occupancy.
  • Schedule lighting control in buildings above 70 kW as a mandatory measure by 31 December 2029, whatever the EnEfG test shows.
  • Measure savings before and after the retrofit and update the implementation plan.

SensMotion plans detection areas in 3D and its monitoring provides consumption data per zone for implementation plans and Section 56 evidence. An optional maintenance and energy management contract covers ongoing operation.

Frequently asked questions

Does the 7.5 GWh threshold still apply?

Yes. Until the bill is passed and in force, Section 8 EnEfG applies as it stands. Bill 21/8027 provides for 23.6 GWh but had not been adopted as of November 2026.

Do I have to implement economic measures from the audit?

The EnEfG requires published, confirmed plans, not implementation. For lighting control in German non-residential buildings above 70 kW, the duty to install follows from Section 56(6) GModG, deadline 31 December 2029.

Does lighting electricity count towards total final energy consumption?

Yes. The EnEfG refers to the company's entire final energy consumption across all energy carriers, lighting electricity included.

Are SMEs exempt from the energy audit?

Currently the audit duty applies to non-SMEs. The bill would switch to a consumption threshold above 2.77 GWh, so SMEs could be covered in future. As of November 2026, this has not been adopted.

Does an energy audit replace compliance with Section 56 GModG?

No. The audit assesses measures, while Section 56 requires the building to actually be fitted with automatic lighting control. Audit data does help to document zones, savings and economics.

Last reviewed: 18 November 2026. General information, not legal advice. The legal text is authoritative.

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.