- BEG EM
- guideline of 20.07.2026, valid from 21.07.2026 (BEG EM, Germany)
- Individual measure lighting in non-residential buildings
- removed (BEG EM from 21.07.2026)
- Building automation of at least class B
- 15 % grant (BAFA) or KfW loan (BEG EM, class per DIN V 18599-11)
- Upper limit
- €500/m² net floor area for all measures combined (BEG EM)
- Energy efficiency expert
- mandatory (BEG EM)
- EEW module 4
- general indoor and outdoor lighting not eligible (EEW, BAFA)
What changed in the BEG EM in 2026?
The BEG EM (Bundesförderung für effiziente Gebäude, Einzelmaßnahmen, the German federal funding for efficient buildings, individual measures) applies in a new version: guideline of 20 July 2026, valid from 21 July 2026. One change is central for lighting control: the individual measure for lighting in non-residential buildings has been removed. A lighting-only measure can therefore no longer be funded as a separate individual measure under the BEG EM.
What remains eligible is MSR technology for building automation, meaning measurement, control and regulation technology (Mess-, Steuer- und Regelungstechnik). The requirement is at least class B under the German standard DIN V 18599-11. Funding is a 15 % grant via BAFA, the Federal Office for Economic Affairs and Export Control, or alternatively a loan from KfW, the German state-owned development bank.
What conditions apply to building automation?
Several points apply to funding for building automation under the BEG EM:
- Efficiency class: at least class B under DIN V 18599-11.
- Energy efficiency expert: involving one is mandatory.
- Application before project start: the application must be submitted before the project begins.
- Contract with a condition: the application must include a supply or service contract with a condition precedent or a condition subsequent.
- Upper limit: €500/m² net floor area for all measures combined.
On the classes: the GModG already refers to DIN/TS 18599-11:2025-10 in Section 56(3), and from 1 January 2027 DIN/TS 18599:2025-10 also replaces DIN V 18599:2018-09 in the energy balance. Other rules, such as the BEG EM funding guideline, still cite DIN V. For funding, the guideline is authoritative. The European system of efficiency classes A to D is set out in DIN EN ISO 52120-1, the successor to EN 15232-1.
What applies under the EEW?
The EEW (Bundesförderung für Energie- und Ressourceneffizienz in der Wirtschaft, federal funding for energy and resource efficiency in business), run by BAFA, is aimed at companies. Two modules are relevant to lighting:
- Module 4: general indoor and outdoor lighting is not eligible. Only process-related special lighting can be funded.
- Module 3 (measurement and control, sensors, energy management software): only with integration into an energy management system via BAFA-listed software, and only in individual cases.
Lighting control for halls, warehouses or offices therefore does not normally fall under module 4. Whether module 3 is an option depends on integration into an energy management system and has to be clarified case by case.
What does this mean in practice?
For a lighting-only control project, only limited funding routes remain under the BEG EM and the EEW as of 10/2026. That does not change the obligation: under § 56(6) sentence 1 of the GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz), non-residential buildings above 70 kW must be equipped with automatic lighting control by 31 December 2029. Our obligation check shows whether your building is covered. The details are explained in our article on § 56(6) GModG.
Against the loss of funding stands a strong argument: lighting control pays for itself through the savings. In halls and warehouses with low occupancy, project values are often much higher than the averages from studies, with a guide value above 60 % and sensor-based savings of up to 75 %, always depending on the project. How to calculate this robustly and measure it later is shown in calculating and verifying savings. New luminaires are not required. Existing LED luminaires with dimmable drivers can be retrofitted, which keeps the effort contained.
If you are planning class B building automation anyway, it is worth looking at the project as a whole. The lighting control sensors supply data for building automation. Whether and to what extent lighting can be included in a funded project is clarified case by case by the energy efficiency expert.
A lack of funding does not automatically make a measure unreasonable either. The yardstick for the exemption is the economic efficiency requirement in § 5 GModG; see economically unreasonable.
How do you approach a funding application?
The order of steps is decisive. Placing an order too early puts the funding at risk.
- Involve an energy efficiency expert early: they check whether the project meets the requirements and support the application.
- Define the project: which measures belong to building automation, which class is achieved, and how large the net floor area is.
- Sign a conditional contract: a supply or service contract with a condition precedent or subsequent, to be enclosed with the application.
- Apply before project start: clarify with the expert, based on the guideline, which steps already count as the start of the project.
- Implementation and evidence: after implementation, the required evidence has to be provided. Measured data from monitoring help to document the effect.
SensMotion does not provide funding advice. The energy efficiency expert is responsible for the application and for assessing eligibility.
Frequently asked questions
Is lighting control still funded under the BEG EM in 2026?
Not as a separate individual measure. The individual measure for lighting in non-residential buildings has been removed since 21 July 2026. Control technology for building automation of at least class B under DIN V 18599-11 is funded, with a 15 % grant or a KfW loan.
Can I get EEW funding for LED high-bay lighting?
Normally not. Module 4 of the EEW excludes general indoor and outdoor lighting; only process-related special lighting is eligible. Sensors under module 3 are only possible with integration into an energy management system via BAFA-listed software, and only in individual cases.
May I place an order before applying?
The application must be submitted before the project starts. It must include a supply or service contract with a condition precedent or subsequent. Clarify the exact sequence with the energy efficiency expert beforehand.
Does the obligation lapse if there is no funding?
No. The obligation under § 56(6) GModG applies regardless of funding programmes. An exemption is only possible if the installation is technically impossible or economically unreasonable, measured against the economic efficiency requirement in § 5 GModG.
How up to date is this information?
The information reflects the status as of 10/2026. Funding guidelines change regularly. The version currently in force at BAFA and KfW is authoritative.
Last reviewed: 18 November 2026. General information, not legal advice. The legal text is authoritative.