Lighting control in Austria and Switzerland: status 2026

Updated 18 November 20266 min readSensMotion editorial team
In shortIn Austria, the federal states (Länder) transpose Article 13 of the EU buildings directive (EPBD). Vienna, Lower Austria and Tyrol already require automatic lighting control in non-residential buildings with systems above 290 kW by or from 31 December 2027 and above 70 kW by or from 31 December 2029; Upper Austria has published a draft. Switzerland is not bound by the EPBD; there, cantonal energy rules based on the MuKEn set limits for lighting electricity under SIA 387/4 for new builds and conversions above 1,000 m².
At a glance
Vienna
above 290 kW by 31 Dec 2027, above 70 kW by 31 Dec 2029 (Section 14b WHLKG 2015, as amended by LGBl. No. 25/2026)
Lower Austria
above 290 kW by 31 Dec 2027, above 70 kW by 31 Dec 2029 (Section 44a(3) and (4) NÖ BO 2014, since 29 May 2026)
Tyrol
above 290 kW from 31 Dec 2027, above 70 kW from 31 Dec 2029 (Section 38(7) TBV 2026, LGBl. No. 59/2026)
Upper Austria
draft with 1 Jan 2028 and 1 Jan 2030 (draft amendment to the Oö. BauTV 2026, status 19 Aug 2026)
Switzerland
lighting limits under SIA 387/4 above 1,000 m² energy reference area (Art. 1.22 MuKEn 2025)

Why do the Austrian states regulate lighting control?

Austrian building law is a state matter. The states harmonise energy requirements through OIB Guideline 6 (September 2025 edition), which each state makes binding. The EPBD had to be transposed by 29 May 2026. On 15 July 2026, the European Commission sent letters of formal notice to all 27 Member States, Austria included.

OIB Guideline 6 (2025) introduces minimum requirements for existing non-residential buildings: by 2030 they must perform better thermally than the worst 16 %, by 2033 than the worst 26 %. This is measured by reference heating demand, so lighting plays no part. Lighting control arrives by another route: the states have written Article 13(12) EPBD into their rules on technical building systems.

Which Austrian states already require lighting control?

To our knowledge, as of November 2026:

StateLegal basisDeadlinesNotes
ViennaSection 14b Vienna Heating, Ventilation and Air-Conditioning Act 2015, amended by the W-EGUG 2026 (in force since 15 July 2026)above 290 kW by 31 Dec 2027, above 70 kW by 31 Dec 2029where technically and economically feasible; zoning and occupancy detection are mandatory
Lower AustriaSection 44a(3) and (4) Lower Austrian Building Code 2014 (since 29 May 2026)above 290 kW by 31 Dec 2027, above 70 kW by 31 Dec 2029where technically and economically feasible; zoning and occupancy detection mandatory; fines up to €5,000
TyrolSection 38(7) Technical Building Regulations 2026 (published 15 July 2026)above 290 kW from 31 Dec 2027, above 70 kW from 31 Dec 2029zoning and occupancy detection are mandatory
Upper Austriadraft amendment to the Upper Austrian Building Technology Ordinance 2026above 290 kW from 1 Jan 2028, above 70 kW from 1 Jan 2030draft, status 19 Aug 2026
other statesno adopted rule foundopencheck current status

In Vienna, fitting the equipment counts as economically feasible if its cost is lower than the expected monetary savings over its expected lifetime (Section 14b(3)). For a retrofit to existing LED luminaires, this can usually be demonstrated.

On the threshold, the explanatory notes to the Upper Austrian draft treat the individual system as decisive, not the sum of several, citing Commission guidelines of 30 June 2025. The German interpretation is explained under the 70 kW threshold.

Differences from Germany

The Austrian states adopt both EPBD stages and mandatory zoning and occupancy detection. Germany chose a single deadline of 31 December 2029 above 70 kW in Section 56(6) of the GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz), where zoning and occupancy detection are a "should" (Soll) requirement. For other EU countries, see EPBD Article 13: Germany and the EU.

As of November 2026, without guarantee. This article is not legal advice; the statutory texts of the states and cantons are authoritative. We write from a German perspective.

How is lighting energy assessed in Austria?

For lighting energy demand, Austria uses ÖNORM H 5059-1; the edition of 15 October 2025 is a national supplement to EN 15193-1 (LENI), in which occupancy and daylight control enter through factors. In our understanding, controls therefore also affect the calculated lighting energy in a non-residential energy certificate. Clarify details with your certificate issuer.

What applies in Switzerland?

Switzerland is not an EU member, so the EPBD does not apply. Energy use in buildings is primarily a cantonal matter, based on the Model Energy Regulations of the Cantons (MuKEn) drawn up by the Conference of Cantonal Energy Directors (EnDK).

The basic module of the MuKEn 2014 made the SIA 387/4 standard the basis for lighting requirements. Many cantons use the EN-111 enforcement aid and form. The EnDK adopted the MuKEn 2025 on 29 August 2025, with implementation in the cantons targeted by 2030. Three points matter for non-residential buildings:

  • Art. 1.22 (basic module): new builds, conversions and changes of use above 1,000 m² energy reference area must demonstrate compliance with the annual lighting electricity limits under SIA 387/4, 2023 edition. Residential buildings are exempt.
  • Module 14 (optional for cantons): new builds are to have intelligent controls, including demand-based lighting control in non-residential buildings from 1,000 m² of lit floor area.
  • Module 7 (optional for cantons): operational optimisation every five years, including electrical systems and building automation, in non-residential buildings using at least 200,000 kWh of electricity a year.

All cantons must adopt the basic module; modules 2 to 14 are optional. To our knowledge, the MuKEn contain no lighting retrofit duty for existing buildings without works. Triggers in existing buildings are conversions and changes of use, operational optimisation under module 7 and the large-consumer article: above 0.5 GWh of electricity a year, the authority can require reasonable measures to be implemented (Art. 1.55 MuKEn 2025).

What should owners in Austria and Switzerland do now?

  • Austria: check the system output for each building and plan for the end-2027 deadline for buildings above 290 kW, including in states that have not yet decided.
  • Austria: plan zoning and occupancy detection as standard, since the states make them mandatory, see zoning and occupancy detection.
  • Switzerland: for conversions above 1,000 m², plan for the SIA 387/4 limit; occupancy and daylight control help to meet it.
  • Both countries: measure consumption before and after the retrofit to evidence savings.

Technically, retrofitting is the same in all three countries, see retrofitting lighting control without new luminaires. Planning detection areas from manufacturer diagrams, as SensMotion does in its 3D planning, works regardless of the legal framework.

Frequently asked questions

Does the EPBD apply directly in Austria?

No. The directive is addressed to Member States. Owners are bound by state laws and ordinances, for example in Vienna, Lower Austria and Tyrol.

Do I have to retrofit in Vienna by the end of 2027?

If a heating, air-conditioning or combined system has an effective rated output above 290 kW: yes, where technically and economically feasible (Section 14b(1) WHLKG 2015). Above 70 kW, the deadline is 31 December 2029.

What applies in states without their own rule?

As of November 2026, we have found no adopted duty there. Since Austria must transpose the EPBD, rules are to be expected; Upper Austria has published a draft.

Is lighting control mandatory in Switzerland?

To our knowledge, there is no general retrofit duty. For new builds, conversions and changes of use above 1,000 m², limits under SIA 387/4 apply. Cantons that adopt module 14 of the MuKEn 2025 would additionally require demand-based lighting control in new builds.

Do the Austrian deadlines apply to my German sites?

No. In Germany, Section 56(6) GModG applies, with a deadline of 31 December 2029 above 70 kW. With sites in both countries, plan to each site's deadline.

Last reviewed: 18 November 2026. General information, not legal advice. The legal text is authoritative.

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.