EPBD Article 13: lighting control in Germany and the EU

Updated 18 November 20266 min readSensMotion editorial team
In shortArticle 13(12) of the EU Energy Performance of Buildings Directive (EPBD) requires automatic lighting control in non-residential buildings in two stages: above 290 kW by 31 December 2027 and above 70 kW by 31 December 2029, with zoning and occupancy detection as mandatory features. Germany's Section 56(6) GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz) sets a single deadline of 31 December 2029 above 70 kW and phrases zoning and occupancy detection as "should". Other EU countries are at very different stages of transposition.
At a glance
Directive
(EU) 2024/1275, in force since 28 May 2024 (EPBD)
Transposition deadline
29 May 2026 (EPBD)
EU stages
above 290 kW by 31 Dec 2027, above 70 kW by 31 Dec 2029 (Article 13(12) EPBD)
Germany
above 70 kW by 31 Dec 2029 (Section 56(6) GModG)
Commission
letters of formal notice to all 27 Member States on 15 July 2026

What does Article 13(12) EPBD require?

The recast Energy Performance of Buildings Directive, Directive (EU) 2024/1275, entered into force on 28 May 2024. Member States had to transpose it into national law by 29 May 2026. Article 13(12) requires them to make automatic lighting control mandatory for non-residential buildings in two stages:

  • non-residential buildings above 290 kW by 31 December 2027,
  • non-residential buildings above 70 kW by 31 December 2029.

As with building automation, the thresholds refer to the rated output of the heating, air-conditioning or combined systems. The Directive phrases zoning and occupancy detection as "shall". It is addressed to Member States and becomes binding on building owners only through national legislation.

How has Germany transposed Article 13?

Germany transposes the EPBD, among other instruments, through the GModG. The Act replaced the former Buildings Energy Act (GEG) and has been in force since 29 July 2026 (BGBl. 2026 I No. 226). The lighting control duty is in Section 56(6): non-residential buildings with a heating, air-conditioning or combined heating/air-conditioning and ventilation system above 70 kW must be equipped with automatic lighting control by 31 December 2029. The details are explained in our article on Section 56(6) GModG.

No separate 2027 stage

Germany has not adopted the 2027 stage for buildings above 290 kW as a separate deadline. A single date applies: 31 December 2029 above 70 kW. For owners of large buildings, this initially means two more years than the Directive's wording. Whether that will last is open. A later tightening is conceivable, but that is an assessment, not a foreseeable change in the law. If you are planning anyway, aligning with the earlier stage costs you nothing.

"Should" instead of "shall"

Under Section 56(6) sentence 2 GModG, the control should be appropriately zoned and include occupancy detection. The EPBD makes both mandatory. In German administrative law, however, a "should" provision describes the default case, and departures are only permitted in atypical, justifiable situations. In practice, the German standard is therefore close to the Directive. Plan zones and occupancy detection as standard; see Zoning and occupancy detection.

Germany and the EU compared

ItemEPBD Article 13(12)Germany, Section 56(6) GModG
Buildings above 290 kWby 31 Dec 2027no separate deadline, 31 Dec 2029
Buildings above 70 kWby 31 Dec 2029by 31 Dec 2029
Zoningshallshould (default case)
Occupancy detectionshallshould (default case)
Penaltiesset by Member Statesnone stated for paragraph 6, up to EUR 5,000 for paragraph 1 (Section 108 GModG)
Exemptionsdepending on national transpositiontechnically impossible or economically unreasonable (Sections 5 and 102 GModG)

On the absence of a fine for lighting in Germany: the obligation applies regardless. It can become relevant in leases, acquisitions and due diligence, ESG reporting and financing. In addition, the sensors supply data for the building automation under Section 56(1), where breaches can be fined.

This article is not legal advice; the statutory text is authoritative. Country information reflects the status as of November 2026 and is provided without guarantee.

How far are other EU countries?

On 15 July 2026, the European Commission sent letters of formal notice to all 27 Member States regarding EPBD transposition. The German GModG entered into force two weeks later. Status in selected countries, as of November 2026:

CountryTransposition status
Netherlandsfirst transposition tranche (Stb. 2026/103) in force since 29 May 2026. Under the Bouwbesluit (Bbl Art. 3.145/3.147, 4.160c/e), automatic lighting control applies above 290 kW from 1 January 2028 and above 70 kW from 1 January 2030
Austriatransposition by the federal states. Vienna (§ 14b WHLKG 2015, W-EGUG 2026), Lower Austria (§ 44a NÖ BO 2014) and Tyrol (§ 38 TBV 2026) require automatic lighting control above 290 kW by 31 Dec 2027 and above 70 kW by 31 Dec 2029. Upper Austria: draft. Details: Lighting control in Austria and Switzerland
Belgium (Flanders)draft decree, only partial transposition
FranceDécret BACS 2023-259 governs building automation; Décret n° 2025-1343 of 26 December 2025 moved the 70 kW stage to 1 January 2030. Lighting control obligation not yet transposed
Italydecreto legislativo in preparation (as of late October 2026)
Spainpartially transposed, RITE amendment pending
Polandnot transposed

The picture is mixed. Besides Germany, the Netherlands, Sweden and Slovakia have already regulated lighting control nationally, the Netherlands and Sweden with later dates (2028/2030). Our EU country tracker shows the status of all 27 countries. In Austria, Vienna, Lower Austria and Tyrol have already adopted both EU stages; other states have not yet. In France, Italy, Spain, Poland and Flanders, based on the available information, transposition of the lighting control duty under Article 13(12) is missing wholly or in part.

What does this mean for organisations with sites in several countries?

If you operate buildings in several EU countries, you cannot rely on a single deadline. The Directive sets the framework; national laws determine deadlines, exemptions and penalties. Where transposition is still outstanding, the Directive nevertheless remains the benchmark national rules must meet.

For portfolio planning, the following approach makes sense:

  • Sort buildings by system output: above 290 kW and above 70 kW.
  • For buildings above 290 kW, consider the EU stage of 31 December 2027 as a planning target, even where national law, as in Germany, applies later.
  • Treat zoning and occupancy detection as standard everywhere, since the EPBD makes them mandatory.
  • Monitor national legislation, particularly where information is inconsistent or drafts are pending.
  • Measure and document savings consistently so that evidence is comparable across countries.

Technically, the retrofit is the same in every country. SensMotion retrofits existing LED lighting wirelessly and provides comparable consumption data per zone through its monitoring. More on the method: Retrofitting lighting control on existing luminaires and Calculating and verifying savings.

Frequently asked questions

Does the EU deadline of 31 December 2027 apply in Germany?

Not as a separate deadline. Germany has not adopted the 2027 stage and requires lighting control uniformly by 31 December 2029 above 70 kW. A later tightening is conceivable but has not been decided.

Is the EPBD directly binding on building owners?

The Directive is addressed to Member States. National laws bind owners, in Germany the GModG. The Directive nevertheless remains the benchmark against which national transposition is measured.

Did the Commission also write to Germany?

Yes. On 15 July 2026, the Commission sent letters of formal notice to all 27 Member States regarding EPBD transposition. At that point the transposition deadline of 29 May 2026 had passed and the GModG was not yet in force; it has applied since 29 July 2026.

Which deadline applies in the Netherlands?

Under the Dutch Bouwbesluit (Stb. 2026, 103), automatic lighting control applies above 290 kW from 1 January 2028 and above 70 kW from 1 January 2030. This matches RVO's information, as of November 2026.

Does the German "should" meet the EU requirement?

In German administrative law, "should" is the default case, and departures need an atypical, justifiable situation. If you implement zoning and occupancy detection, you meet both the German "should" and the Directive's "shall".

Last reviewed: 18 November 2026. General information, not legal advice. The legal text is authoritative.

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.