In shortOn 1 January 2027, Article 2 of Germany's Building Modernisation Act comes into force: the reference building will then assume LED lighting, and non-residential buildings will need a demand-based energy certificate with classes A to G when sold or let. The deadline for automatic lighting control under Section 56(6) remains 31 December 2029.

What comes into force on 1 January 2027?

The GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz, sometimes abbreviated GMG) has applied since 29 July 2026. Under Article 9(2) of the amending act (BGBl. 2026 I No. 226), Articles 2 and 7 come into force on 1 January 2027. Energy calculations will then follow DIN/TS 18599:2025-10 instead of DIN V 18599:2018-09 (Section 20(1)). All key dates are listed in GModG timeline: what applies when.

LED becomes the benchmark in the reference building

Under Annex 2 No. 3.1, the reference building for non-residential buildings will assume LEDs in LED luminaires instead of fluorescent lamps. Presence detectors, constant light control and daylight-dependent control "dimmed, not switching off" in specified zones, as well as building automation class C, were already part of the reference. New are the LED light source, standards references and zone numbers. A building with LED but no controls will therefore fall short of its benchmark in those zones.

Demand-based certificate and classes A to G

When a non-residential building is sold, let or leased, the energy certificate must be based on a calculated energy balance under Section 81, in other words a demand-based certificate (Section 80(3) sentence 2). This applies unless a valid certificate already exists. The efficiency class from A to G follows from the ratio of primary energy demand to that of the reference building (Section 86(4), Annex 10a). Only zero-emission buildings may be placed in class A. Built-in lighting is part of the demand. Details in energy certificate for non-residential buildings from 2027.

Inspection: exemption through building automation

From 2027, the energy inspection under Section 74(1) covers ventilation systems above 70 kW in addition to air-conditioning systems above 12 kW. It does not apply if the building has a building automation and control system meeting Section 56(2) (Section 74(3) No. 1). Building automation under Section 56(1) is mandatory above 70 kW by 31 December 2029 anyway.

Outlook: minimum energy performance under Section 40

Article 2 also introduces a new Section 40. From 1 January 2030, the primary energy demand of an existing non-residential building, including built-in lighting, may not exceed 3.5 times that of the reference building, and from 1 January 2033 not more than 2.95 times. Many buildings are deemed compliant under Section 40(3), and further cases are exempt. More in minimum energy performance from 2030.

What stays the same?

The obligation to install automatic lighting control under Section 56(6) continues to apply to non-residential buildings above 70 kW by 31 December 2029. No new luminaires are required, but from 2027 lighting already shows in the energy certificate and energy balance. This news item is not legal advice; the statutory text is authoritative.

Source

General information, not legal advice. The legal text is authoritative.

Getting started

From your question to a finished plan.

Free initial consultation, one contact person.

Send a photo of the driver labelWe check free of charge whether your luminaires can be retrofitted.
Add your floor planWe turn it into a 3D model with sensors and zones.
Planning and quoteYou see the result in 3D first, then you decide.