> Section 71a of the former German Building Energy Act (GEG) required, from 2024, building automation in non-residential buildings with a heating or air-conditioning system above 290 kW by 31.12.2024; it contained no lighting control duty. Since 29.07.2026, Section 56 of the GModG (German Building Modernisation Act, Gebäudemodernisierungsgesetz) has replaced it: the threshold drops to 70 kW, the deadline is 31.12.2029, the system needs six functions, and subsection 6 additionally requires automatic lighting control.

!fakten
- Old: Section 71a GEG, in force 01.01.2024 to 28.07.2026 (inserted by BGBl. 2023 I No. 280)
- New: Section 56 GModG, in force since 29.07.2026 (Art. 1 No. 26, BGBl. 2026 I No. 226)
- Threshold: 290 kW old, 70 kW new (Section 56(1) GModG)
- Deadline, existing buildings: 31.12.2024 old, 31.12.2029 new (Section 56(1) GModG)
- Lighting control: new, by 31.12.2029 (Section 56(6) GModG)

## What did Section 71a GEG require?

Section 71a "Gebäudeautomation" (building automation) was inserted by the GEG amendment of 16.10.2023 (BGBl. 2023 I No. 280) and applied from 01.01.2024. It was repealed with effect from 29.07.2026: Article 1 No. 32 of the amending act deletes Sections 71 to 73. We summarise its former content, paraphrased from the consolidated version:

- Subsection 1: non-residential buildings with a heating system or combined space heating and ventilation system above 290 kW rated output had to be equipped with a building automation and control system by the end of 31.12.2024. Sentence 2 extended this to air-conditioning and combined air-conditioning and ventilation systems above 290 kW.
- Subsection 2: digital energy monitoring technology with five capabilities was required: monitoring, logging and analysing consumption, providing data via an open interface, setting target values, detecting efficiency losses and informing the responsible person. In addition, a person or company had to be named or appointed for building energy management.
- Subsection 3: new buildings needed at least automation grade B under DIN V 18599-11: 2018-09 and technical commissioning management.
- Subsection 4: existing buildings that already had grade B or better had to ensure cross-manufacturer communication of their systems by 31.12.2024.

Section 71a contained no lighting control duty. For existing buildings, a widely held interpretation was that digital energy monitoring sufficed. Breaches of Section 71a(1) could be fined up to €50,000 under Section 108 GEG as in force until 28.07.2026. The 290 kW threshold reflected the earlier version of the EU Energy Performance of Buildings Directive; the current EPBD is staged differently, see [EPBD Article 13 in Germany and the EU](/en/knowledge/epbd-article-13-germany-eu/).

## What changed with Section 56 GModG?

| Feature | Section 71a GEG (2024) | Section 56 GModG (since 29.07.2026) |
|---|---|---|
| Threshold | more than 290 kW | more than 70 kW |
| Deadline, existing buildings | 31.12.2024 | 31.12.2029 |
| System types | heating, space heating/ventilation, air-conditioning via sentence 2 | all four types in subsection 1 sentence 1 |
| Minimum functions | five, focus on energy monitoring | six, adding consumption adjustment and indoor environmental quality |
| Energy manager | to be named or appointed | no longer in the wording |
| New buildings | grade B to DIN V 18599-11: 2018-09 | grade B above 290 kW, grade C above 70 kW to DIN/TS 18599-11: 2025-10 |
| Existing systems | grade B: communication by 31.12.2024 | subsection 4: installed up to three years before 01.01.2027, later upgrade allowed |
| Exemption | no specific clause in Section 71a | technically not possible or economically unreasonable |
| Lighting control | none | subsection 6: mandatory, zoning and occupancy detection as "soll" |
| Fine | up to €50,000 | up to €5,000 (Section 108(2) No. 3) |
| Inspection exemption | reference to Section 71a | from 01.01.2027 reference to Section 56(2) (Section 74(3) No. 1) |

The deadline thus moves by five years. More time does not mean less work: far more buildings are covered because the threshold falls from 290 to 70 kW, and subsection 6 adds lighting. The lower fine does not soften the duty either. It applies regardless of the fine and can matter in leases, due diligence, ESG reporting and financing. The full new wording is in [GModG Section 56 full text](/en/knowledge/gmodg-section-56-full-text/).

## What happens to systems installed under Section 71a?

A system that met Section 71a does not automatically meet Section 56. Check it against the six functions in Section 56(2). Typical gaps are adjustment of consumption (No. 1) and monitoring of indoor environmental quality (No. 6), neither of which Section 71a required.

- Installed from 01.01.2024: by our own derivation, such a system falls within the period of up to three years before 01.01.2027. If it does not meet subsection 2, Section 56(4) allows an upgrade after 31.12.2029. The wording sets ten years without expressly stating when the period starts.
- Installed before 2024: the transitional rule does not apply. Missing functions must be added by 31.12.2029.
- Lighting control: subsection 4 covers building automation only. Automatic lighting control is required by 31.12.2029 in every case.

If you missed the 31.12.2024 deadline, Section 56 now governs. How omissions before 29.07.2026 are to be assessed is, as far as we can see, not expressly addressed by the amending act; seek legal advice on this. What Section 56(1) requires in detail: [Building automation under Section 56(1)](/en/knowledge/building-automation-obligation-gmodg-56-1/).

## Why do people still search for "GEG lighting"?

The name GEG was in use from 2020 to July 2026, and many contracts, tenders and energy certificates still refer to it. Article 1 No. 1 renamed the act "Gebäudemodernisierungsgesetz – GModG", sometimes also abbreviated GMG. Under the GEG, lighting was already part of the energy balance of non-residential buildings, with the reference building assuming fluorescent lamps with electronic ballasts. There was, however, no separate duty for automatic lighting control in existing buildings; that duty first appears in Section 56(6) GModG. So anyone searching for "GEG lighting" will find today's answer in the GModG. Which rule applies from when: [GModG timeline](/en/knowledge/gmodg-timeline-what-applies-when/).

!> This comparison is not legal advice; the statutory text is authoritative. Statements on the former Section 71a GEG are based on the consolidated version and paraphrased.

## What should you do now?

- Recheck the threshold: buildings between 70 and 290 kW were not covered before and are now; see [Am I affected? The 70 kW threshold](/en/knowledge/affected-70-kw-threshold/).
- Compare existing systems against Section 56(2) and document their installation date.
- Plan lighting control under Section 56(6), regardless of whether building automation falls under subsection 4.

## Frequently asked questions

### Does Section 71a GEG still apply?

No. Section 71a was deleted with effect from 29.07.2026 by Art. 1 No. 32, BGBl. 2026 I No. 226. The building automation duty is now in Section 56 GModG.

### Did the GEG already require lighting control?

Not as a separate duty for existing buildings. Lighting was part of the energy balance; automatic lighting control is first required by Section 56(6) GModG, above 70 kW by 31.12.2029. Details: [Section 56(6) GModG explained](/en/knowledge/lighting-control-obligation-gmodg-56/).

### My building has 150 kW. Was I covered by Section 71a?

Not under Section 71a, as the threshold was 290 kW. Under Section 56 GModG you are: above 70 kW you need building automation and automatic lighting control by 31.12.2029.

### Is my energy monitoring installed under Section 71a sufficient?

Not without checking. Section 56(2) requires six functions, including adjustment of consumption and monitoring of indoor environmental quality. Add missing functions or check whether subsection 4 applies.